
Software for efficient surface mine design, scheduling, and analysis, supporting pit layouts, reserve calculation, and haul cycle evaluation.
Vendor
Carlson Civil
Company Website




Carlson Surface Mining is a specialized software module designed for surface mine engineers and planners to efficiently design, analyze, and schedule mining operations. It enables users to create and modify pit and property layouts, perform 3D designs, calculate reserves, and manage mine scheduling and equipment timing. The software integrates geologic and surface modeling, allowing for accurate calculations of overburden, ore quantities, strip ratios, and cost estimations. It also supports haul truck cycle analysis, dragline range diagrams, and provides tools for evaluating multiple mining scenarios to optimize productivity and resource allocation.
Key Features
Pit and Property Layouts Design and modify mine pits and property boundaries in plan, section, and 3D views.
- Flexible pit and spoil layout routines
- 3D pit and fill design
Reserve Calculation Accurately calculate mineable reserves and classify them for reporting.
- Reserve classification (measured, indicated, inferred)
- Volume and tonnage reporting
Scheduling and Timing Plan and analyze mine production schedules and equipment usage.
- Production timing based on calendar, tonnage, or volume
- Equipment and haul truck cycle analysis
Haul Truck Cycle Analysis Evaluate and optimize haul routes and cycles for efficiency.
- Haul route modeling and analysis
- Integration with scheduling routines
Dragline and Equipment Planning Support for dragline range diagrams and auxiliary equipment planning.
- Dragline cut sequencing
- Dozer push and other equipment routines
3D Visualization and Design Visualize mine designs and progress in 3D for better decision-making.
- 3D pit, spoil, and terrain modeling
- Color-coded production timing and statistics
Benefits
Increased Efficiency Automates complex mining calculations and scheduling to save time and reduce errors.
- Most tasks completed in minutes instead of hours
- Reduces manual data handling
Improved Mine Planning Enables informed decision-making with accurate data and scenario analysis.
- Test multiple mine layouts and schedules
- Optimize resource allocation and minimize costs